or
Sign in to turn on 1-Click ordering.
or
Amazon Prime free trial required. Sign up when you check out. Learn more
More Buying Choices
Have one to sell? Sell yours here
Cost Estimating Manual for Pipelines and Marine Structures 1999: New Printing (Estimator's Man-Hour Library)
 
 
Tell the Publisher!
I’d like to read this book on Kindle

Don't have a Kindle? Get your Kindle here, or download a FREE Kindle Reading App.

Cost Estimating Manual for Pipelines and Marine Structures 1999: New Printing (Estimator's Man-Hour Library) [Paperback]

John S. Page
2.0 out of 5 stars  See all reviews (1 customer review)
RRP: £82.00
Price: £77.90 & this item Delivered FREE in the UK with Super Saver Delivery. See details and conditions
You Save: £4.10 (5%)
o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o o
In stock.
Dispatched from and sold by Amazon.co.uk. Gift-wrap available.
Only 3 left in stock--order soon (more on the way).
Want guaranteed delivery by Wednesday, May 30? Choose Express delivery at checkout. See Details
‹  Return to Product Overview

Inside This Book (Learn More)
First Sentence
It is the intent and express purpose of his section to cover as nearly as possible all erection operations, in the form of labor crews and equipment spreads, that may be necessary for the complete installation of several hundred miles of cross-country pipeline. Read the first page
Browse Sample Pages
Front Cover | Copyright | Table of Contents | Excerpt | Back Cover
Search inside this book:

Concordance (Learn More)
These are the most frequently used words in this book.
100  200  250  500  above  add  ample  anchor  average  barge  based  coated  concrete  conditions  construction  cost  crane  crew  day  deck  derrick  description  ea  equipment  factors  feet  following  foreman  frames  hours  inches  include  installation  installed  installing  items  jacket  joints  labor  launch  lay  length  line  linear  listed  loose  material  may  men  necessary  number  offshore  operations  operator  pages  per  percent  personnel  piles  pipe  pipelay  pipeline  platform  position  productivity  project  quantities  required  requirements  riser  rock  section  see  set  should  size  small  spread  square  storage  submerged  switch  tables  thickness  time  ton  total  truck  type  units  use  used  valves  wall  water  weight  weld  welding  work  working 
‹  Return to Product Overview

Amazon.co.uk Privacy Statement Amazon.co.uk Delivery Information Amazon.co.uk Returns & Exchanges